Article 3 (Work Objectives)
The Contracting Parties shall endeavour to support the goals of this agreement and, in particular, to comply with the following objectives*(36):
a (Anti-Flood Measures)
- the natural flow of the river ..... and its linked waters should not be altered;
- the speed of the water flow should not be increased, directly or indirectly;
- meanders, natural river banks, river branches, marshlands and flood plains should be preserved or recreated;
- commercial or private land use close to the river, possibly aggravating flood situations, should be avoided;
- backwater installations, sluices and floodgates should be maintained or installed, where appropriate;
- the natural seepage of rain water should be fostered;
- mountain areas bordering the river or its linked waters should receive special attention with respect to the aforementioned objectives.
b (Anti-Pollution Measures)
- the introduction of toxic substances into the river ..... and its linked waters as well as the ground water should be avoided;
- the use, especially agricultural use, of land traversed by the river or its linked waters which has negative consequences on the water quality should be avoided;
- the transportation of dangerous cargo on the river ..... should be limited and relief measures should be set up for accidents.
<< Article 2 (Fields of Activity) |
>> Article 4 (Emergency Actions) |
|
European Outline Convention on Transfrontier Co-operation between Territorial Communities or Authorities (Madrid, 21.V.1980) |